Choosing a land plot for SPP: TOP-5 recommendations from EDS-Development

Інсоляційна карта Європи

1. Construction area by insolation parameters, shape and slope of the plot.

The level of solar insolation depends on the choice of the construction area. Geographically, the territory of Ukraine has indicators from 1400 kW per year per 1 square meter in Kherson region to 1180 kW per year per 1 square meter in Lviv and other western regions. The difference in insolation will not have a significant impact on the payback period and effectiveness of SPP, because energy conversion efficiency can be increased by the right choice of photovoltaic modules, inverters, competent design solution.

A striking example is Poland, where the insolation level in the southernmost regions is equal to the minimum in Ukraine while the country is equally built up with efficient solar energy facilities.

The shape, terrain and slope of the plot are pretty intuitive parameters. Of course, the square shape and simple terrain of the land plot will be preferable, because difficulties in these parameters entail additional challenges and costs. Also take into account the orientation of the land plot, the best arrangement of rackings with photovoltaic panels will be on the southern slope.

Інсоляційна карта України
Інсоляційна карта Європи

2. The plot must be an object of civil law rights and have the correct designation

That is, the area, borders should be determined, and information about the land plot must be registered in State Land Cadastre. Usually, the formation of a land plot occurs through the development and approval by the local authorities of the land management project for allotment of land plots from state and communal property lands or through subdivision or merger of previously formed land plots.

Also, the corresponding target designation of land plot - 14.01 – is mandatory for alternative energy facilities. Such designation is most often assigned to plots that are not suitable for agriculture, territories with difficult terrain, nevertheless suitable for industrial construction.

Information provided by the seller is very easy to check on the Internet - the public cadastral map of Ukraine contains data on all land plots, and by comparing the information with the satellite map, you can view all the details.

Кадастровая карта
девелопмент земельных участков

3. Compliance of land plot location with requirements of urban planning legislation

It is worth reminding that any settlement and surrounding lands have their own master plan. Allotment of the land must correspond to the designation of the industrial zone. The construction of any facilities that do not comply with the master plan is prohibited. 

Of course, the law provides for the possibility of amending the urban planning documents of settlements. But remember that it is a long and very expensive procedure as when making changes, public hearings and state expertise are held.

Thoroughly examine the status of the land plot in terms of urban planning legislation and determine whether it is possible to build an industrial solar power plant on it.

Зразок плана території селища
девелопмент земельных участков

4. Analyze the connection parameters of the facility to external electrical grids - this is almost the main characteristic of the land plot

Industrial SPP must transfer the generated energy to external power grids. The conditions for connecting facilities are determined in law by the relevant regulations.

  • Check the grids passing nearby - location, voltage level, length of overhead lines, addresses and names of transformer substations, capacities of distribution substations, distance from the land plot to the point of connection to the grid.
    • Unfortunately, there is no complete interactive map of grids, only 6 regions of Ukraine provided accurate data, in each case it's needed to search for information.
  • • Make a calculation of the cost of connection, it will depend on the region and territory (rural or urban), voltage degree at the point of connection – figures are publicly available (Appendix 11 to the resolution of National commission that implements state regulation in the fields of energy and utilities 28.12.2018 № 2069). Connection costs can vary significantly, for example, if it is necessary to construct / reconstruct a substation or lay electrical transmission lines over a long distance.
  • The main advice of this section: if you do not have experience in checking the above mentioned parameters, it is better to contact specialists who are dealing with external connection. In the legislative and economic situation of our country, the price of mistake in calculating the terms, cost and risks in general is too high.
девелопмент земельных участков
лэп

5. Quality of the soil, availability of communications, facilities, remoteness from the main transport arteries, level of development of the surrounding infrastructure

Optimally, if geological and engineering-geodetic surveys have already been carried out, you get reliable information about the geological section, level of groundwater, physicochemical characteristics of soil. Geodetic data, respectively, contain topographic data, information about the terrain, technogenic and natural conditions of the land plot. If not, the services for these surveys can be ordered.

Check the availability of access roads and highways in order to subsequently avoid significant financial risk. It is necessary to check on whose land the access road passes and who owns the territory. When choosing a plot, make sure that approach to it is available at any time of the year and in any weather.

девелопмент земельных участков
Геодезічна з'їомка - приклад

Our manager will provide a free consultation

Readiness N1. 8 MW project SPP Borki-3

промислова сес Солар солюшн

The EDS group begins the year with signing a contract for the construction of a new 8 MW solar power plant in Kharkiv oblast on the territory of Birky village council, Zmiivs'kyi district near Birky village. In this project we are the general contractor - this is full control over the progress of construction and obligation to build a solar power plant.


As a reminder, in 2019 we have completed the construction of two SPP in this district with a total capacity of 6.2 MW – “Solar Solution”. The projects used the EPCM cooperation format (general contract with a financial guarantee to achieve contracted technical indicators for electricity generation).

сес Солар солюшн Харківська обл
промислова сес Солар солюшн
проект сес 8 МВт Борки

Parameters of the future SPP Borki-3:

 

  • 28120 TALESUN PV modules with a unit capacity of 340 W;
  • 296 string inverters Fronius ECO with a unit capacity of 27 kW;
  • 29 0.4 kV adders of various capacity manufactured by EDS;
  • 4 packaged transformer substations KTP 10 / 0.4 kV along with 1 distributing point RP 10 kV.

our manager will provide a free consultation:

Interview with Alexander Zapyshny - “Electricity storage systems as a tool for maneuvering renewable energy facilities”

Запишний Олександр
Запишний Олександр

 

  1. The relevance of the topic of balancing the market of renewable energy sources in Ukraine.
  2. World experience in solving the problems of maneuvering energy systems and its integration for our conditions.
  3. Concrete suggestions for solving problems - numbers, timelines, examples.

I would like to talk about energy saving systems as a tool for maneuvering the objects of the RES. We understand that the topic is gaining relevance with each month, is discussed for a long time, but there is no noticeable progress. And we must do so if we support the global trend toward green energy. At the same time, there seems to be no clear understanding of who should act as the locomotive for change and move from slogans to concrete actions.

 

Today, in many countries with a level of energy production from RES in times higher than in Ukraine, the accumulation capacities of so smart Grid systems are successfully operating. The world experience in this direction is considerable, it should be studied and applied in Ukraine without trying to invent a bicycle.

 

It would seem that everything has long been invented, just take and do. Why are neither companies nor the state doing this?

 

From my point of view, the issue is money. For example, we are constantly talking about the fact that tens of billions of hryvnias per year are needed for the reconstruction of roads within ten years. And this is only to bring them to a more or less normal state. Such figures are no surprise to anyone. Why, then, doesn’t anyone say that a few billion dollars each year should be allocated for normal, “healthy” energy for a few years, too? And then we have a chance to get a modern, highly-maneuverable, very convenient power system, which will be guaranteed to supply all consumers with high-quality electricity, regardless of where they live in the country.

 

As for business, he is not actively engaged in the development of maneuverable capacities because of weak motivation on the part of the state and lack of economic prerequisites. For example, as the owner of several SPS, I do not see the economic basis for such decisions. It will appear in two cases: (1) in the case of very large fines for non-balance and (2) in the case of restrictions on the periods of the day for the issuance of my generation without compensation. 

Then it can cause me, for example, to accumulate energy during the day and to give it to the power system at night. Until both of the above factors are critical for business, no money will be invested in this. And the reason is simple: For an investor, any extra investment shifts the payback period, and it is not known whether they will be economically sound.

 

To be sure, generating companies can be maneuverable. This is a question from the field of management of alternative energy facilities: What share of generation should be given to the network, and what – to accumulate. Drives must be managed by smart Smart Grid systems that predict and link weather, traditional energy sources, and collect solar and wind data sets. All this is analyzed and decisions made.

 

But now, in the field of maneuverability, the ball is on the side of the state. The state creates the rules of the game on the market. We, business, worked and worked under these rules. It was the state that provided an incentive to develop the green energy industry. The stimulus is very right, I do not argue. But now it is strange to hear the claims that, he said, they have adjusted a lot and what, they say, now with all these capacities to do. What did we do wrong?

 

Instead of voicing the beautiful slogans of “we need to implement smart Grid” or “we lack 2 GW of high-power capacity”, the state should write a specific “road map” in the existing energy strategy and develop a program. What is the question? When the business saw economic attractiveness, it built 2 GW per year only in the sun – we see it well. The state, which is interested in introducing these accumulative capacities, will find both an economic basis and an investor. 

In a year or two, this can be done, which will allow alternative and traditional energy to move on. This applies to both “sunflowers” and “winders” – one can and should act together. Even if I commit business to construction of large objects of the RES to provide a certain percentage of accumulation capacities, – there are no problems, I am ready to participate in it. In fact, it will be much more effective to do this together by business efforts within the framework of a single state program. For example, installing large capacity in several regions of the country will be more accurately profitable than each manufacturer individually mounting them on their SPS or WPS. And that will significantly reduce capital spending on construction. Be sure that the business will support this idea and will be willing to participate in a share if it is well and clearly submitted.

 

Moreover, I believe that the conditions for accession and cost already allow the state to accumulate funds and invest in accumulation and maneuvering. The state, after all, raised the bar very high on accession. Examples do not need to be far away: In the same Poland, the cost of joining is five times lower than in us (we have 50,000 euros / MW, there are 10,000 euros / MW). As a builder, I argue that we have a very high price. Even given the deterioration of our electricity networks, this should cost a maximum of half of the reported amount. This is one of the sources of financing of maneuverable capacities. We will multiply 25,000 euros by 2000 required for storage of megawatts – we will get €50 million This money can be built from 100 to 200 megawatts of storage capacity, or 10% of the amount we need. And these funds can be taken out of the market right now, and they will not affect it in any way. Imagine what you can achieve if you develop a competent program.

 

It is beneficial for the state to create balancing capacities on all sides, since they will provide more flexible operation of the energy system. The “Green” tariff, after all, will gradually decrease. Yes, it is necessary to withstand this financial burden for ten years, and then the state will have and manage a huge number of diversified sources of electricity with absolutely market price. It is important to understand: Either the state subsidizes investors (by raising EBRD funds, for example) and they develop these capacities, or they will be forced to create these capacities on their own. There simply is no other way.

 

My opinion: The most effective solution for our country will be the balance between hydropower and creation of new maneuverable capacities on the basis of batteries. The future is definitely behind storage, because the sun and wind can only be balanced in this way. In view of the fact that we in Ukraine have good hydropower, it also needs to be developed, to strengthen the hydroelectric power stations, and at the expense of this to participate in balancing.

 

I am sure that today both Ukrenergo and Minecenergo are really aware of the country’s needs for creating maneuverable capacities, and have acquired primary experience, faced with problems in practice. Already, they are far more competent than they were three or five years ago to make adequate market-based decisions.

 

The question is just how civilized this will be decided. – власник і директор ЕДС Олександр Запишний

 

Based on http://reform.energy

SPS Rozumivka 4 MW is ready!

промышленная солнечная электростанция 4 МВт

EDS has completed the construction of a new solar power station in the Zaporizhzhya region, Zaporizhzhya district, on the territory of the Razumovsky village council.


SPS parameters are as follows:

  • 15,200 photo panels with a unit power of 345 W;
  • 33 ABB inverters 120 kW and 1 inverter Huawei 40 kW;
    two 10 kV transformer substations with Astor 2500/10 / 0.48 and 2000/10 / 0.48 kVA transformers;
  • a number of relay protection and automation cells for transformers KTP No. 1 and No. 2.
промышленные солнечные электростанции
солнечные эс
промышленная солнечная электростанция 4 МВт

During the construction, we performed the following works:

  • zero cycle and hole drilling;
  • concreting and installation of racks of tables;
  • installation of fencing, administration and amenity complex and utility rooms;
  • installation of PTS 10 / 0,4 kV;
  • development of trenches for the security control point and laying of the 0,4 and 10 kV cables, laying of the solar cable;
  • outdoor lighting installation, video surveillance installation;
  • road construction works;
  • installation and connection of PV modules and inverters;
  • telemechanics;
  • laboratory tests of transformers;
  • installation of ASCA.

Thus, once again, EDS proudly confirms the title of the leading EPC-contractor in Ukraine in classic implementation of turnkey project, when the company assumes the full control of the construction process.