- 100 Мвт ·
Ready-to-build land plots for the construction of industrial SPS
Operating SPP for sale
Capacity: 2 MW
Area: 4 ha
Accommodation: Horianivske, Dnieper district, Dnepropetrovsk region, Ukraine
Start of generation: Phase 1 - September 2018, Phase 2 - April 2019
Green tariff for selling electricity:
0.18 euros with VAT
Released to the electricity network for 2021:
January – 60 000
February – 100 000
March – 240 000
April – 330 000
May – 330 000
June – 380 000
July – 390 000
August – 360 000
September – 290 000
October – 180 000
November – 90 000
December – 45 000
Annual generation in 2019:
3,155,000 kWh
Cost: 2 232 000 euro
Pay-back period:
5 years
Credit debt as of 03/01/2020:
245 500 euro (rate of 6.95% per year)
Installed capacity of photovoltaic modules — 2,3 MW;
Inverter capacity of station – 2,0 MW;
The volume of annual electricity generation is 2518 MW/hour;
CO2 reduction – 4377 tons;
The number of “Jinko Solar” photovoltaic modules (PV modules) – 4200 pcs. with a capacity of 270 W;
The number of “Talesun” photovoltaic modules (PV modules) – 3600 pcs. with a capacity of 325 W;
The number of «Huawei» inverters – 50 pcs. 40 kW each;
The number and power of EDS combiners — 6 units of 160 kW each; 6 units of 170 kW each;
Complete transformer substation KTP 1000/6/0,4 - of production EDS-Engineering
Development of the design documentation;
Supply of solar panels and inverter equipment;
Supply of power and switchboard equipment;
Construction and installation works;
Connection of the constructed SPS to the grid;
Member registration in WEM and “green” tariff approval;
Service maintenance of SPS.
Conversion of solar energy to ~ 6000 V, 50 Hz electric power and its transmission to the electricity grid to other consumers.
Bidirectional counter:
• on generation networks - EPQS 122.23.17 LL;
• on your own - GAMA 300 G3B.
0.4 kV AC power supply:
• 0.4 kV input switch - LZMN4-AE1600 1600 F (EATON);
• surge suppressors - ETITEC B 320 / 12,5 F (ETI).
6 kV AC power supply:
• vacuum switch BB / TEL-10/630 (Tavrida Electric);
• load switches BHA-10/630;
• surge suppressors - OPN-KR / TEL-6 / 7.2 kV.
When operating a solar power plant: • the conditions and operating requirements of the equipment provided by its manufacturers in the relevant instructions must be observed; • Before switching on the equipment, make sure that it is not mechanically damaged; • it is advisable to periodically perform maintenance work on the equipment as recommended by its manufacturer; • Appropriate safety measures must be followed.
Warranty for work - 3 years.
This SPS is 90% Ukrainian. All equipment: construction, electrical – of Ukrainian production.
You can learn more about the construction of solar power plants by calling our manager.
Need more information? CONTACT US DIRECTLY
Switchboard equipment manufactured by EDS-ENGINEERING