Land plot for construction
467 kW SPS ground type
«Chornomorka»

земля под солнечную электростанцию
РОЗРАХУНОК ВИРОБЛЕННЯ ЕЛЕКТРОЕНЕРГІЇ СЕС

Accommodation:
Mykolaiv region, Ochakiv district, village Chornomorka

Status: Private property

Realization: Sale through the sale of the customer's property

Stages of construction:  Construction of the SPS is carried out in 1 stage

Area: 0,6375 ha

Land use designation: 14.01 - for the location, construction, operation and maintenance of buildiings and construction of power generating facilities, institutions and organizations

Cadastral numbers:

4825184801:04:029:0022

Technical conditions: Technical conditions for connection of 350 kW

Cost of connection: according to approved bids charges for non-standard connection of capacity and rates for the linear part of connection for 2020 (Resolution No. 2461 of 22.11.19).

Documents:

  • Topographic and geodetic surveying of the land plot was developed;
  • Engineering and geological surveys were carried out;
  • Land management project developed;
  • Detailed plan of the territory;
  • The project "Stage P" has been developed.
  • TU and Accession Agreement

Infrastructure:

  • Land near the village;
  • Near the paved road; 
  • The plot is flat and has a very good location
  • Connection point: Substation 35/10 kV "Chernomorka";
  • The cost of joining according to the rates for 2020

Tariff: 0,109 € kW/h excluding VAT

 
 
Plot cost: 20 000 eur