Area for solar power plant 100 MW in the Dnipropetrovsk region

земля под солнечную электростанцию 100 МВт

Accommodation: Дніпропетровська обл, Межівський р-н, смт Колона-Межова

Status:  Rent. Land lease for 49 years

Realization: Sale of lease rights

Stages of construction:  Construction of the SPS is carried out in 3 stage

Area: 185 га

Land use designation: 14.01 - for the location, construction, operation and maintenance of buildiings and construction of power generating facilities, institutions and organizations 

Cadastral numbers: 1222687700:01:002:0345
1222687700:02:002:0434
1222687700:02:002:0453

Technical conditions: Project of technical conditions for 100 MW is being coordinated with NEK “UKRENERGO”

Documents:

  • Feasibility study is being developed
  • The Project of Technical Conditions is being coordinated with NEK “UKRENERGO”
  • Topographic and geodetic surveying of the land plot was developed
  • Детальний план території 
  • PV Layout
  • Land management project is developed

Infrastructure:

  • The plot has a very good location,
  • The point of switching on: cabel line. Voltage class 110 Kw
  • Realization of technical conditions cost is 6 000 000 EURO

Pay-back period: 7 years

Cost: 2 500 000 Євро – земельна ділянка без Технічних умов