Земля під сонячну електростанцію 100 МВт в УкраїніEds-development

Land for the construction of a solar power plant 100 MW in the Dnipropetrovsk region

Accommodation: Dnipropetrovsk region, Mezhivskyi district, smt Mezhova

Project"Ursa Major"

Status:  Rent for 30 years

Realization: Sale of lease rights

Area: 185 hectares

Land use designation: 14.01 - for the location, construction, operation and maintenance of buildiings and construction of power generating facilities, institutions and organizations 

Cadastral numbers: 1222687700:01:002:0466;

Technical conditions: for 100 MW is being coordinated with NEK “UKRENERGO”

Documents:

  • Developed by TOS M 1: 500 by agreement "Suitable"
  • Land management project is developed
  • A detailed plan of the territory has been developed and agreed upon;
  • Feasibility study developed and approved;
  • Technical specifications for 100 MW were received and agreed;
  • The project "Stage P" has been developed.

Infrastructure:

  • К точке присоединения 20 км
  • Voltage class at the point of connection 110 kV

Cost: according to the rates for non-standard connection for 2021 (Resolution No. 2701 of 12/23/2020)

Tariff: 0.436 euro / 1 kW * hour excluding VAT