Area for solar power plant 1 MW in the Dnipropetrovsk region, Pokrovske-3

земля под сэс на 1 МВт

Accommodation: Pokrovske, Pokrovska rural settlement, Pokrovskiy district, Dnipropetrovsk region, Ukraine

Status:  Rent. Land lease for 49 years

Realization: Sale of lease rights

Stages of construction:  Construction of the SPS is carried out in 1 stage

Area: 2 ha

Land use designation: 14.01 - for the location, construction, operation and maintenance of buildiings and construction of power generating facilities, institutions and organizations - on translation.

Cadastral numbers: 1224255100:02:002:1268

Technical conditions: 1 MW project

Cost of connection: according to approved bids charges for non-standard connection of capacity and rates for the linear part of connection for 2020 (Resolution No. 2461 of 22.11.19).

Documents:

  • The TС project is being developed;
  • Topographic and geodetic survey was developed;
  • Detailed plan of the territory;
  • Lease agreement;
  • Photographic field plan developed.

Infrastructure:

  • 510 м to Substation  
  • Near the paved road

Tariff: 0,1125 Euro kW/h excluding VAT (with a further decrease of 2.5% annually for 3 years)

Pay-back period: 5 years

Cost: 65 000 Euro - land plot without Specifications.