Area for solar power plant 9 MW in the Khmelnytsk region, Chekhy

земля під сес 1 МВт

Accommodation: village Chekhy, Stara Synyavka district, Khmelnytskyi region

Status: Private land plot

Realization: Realization by selling to the customer’s property

Stages of construction:  Construction of the SPS is carried out in 1 stage

Area:
2 land plots: total area of ​​17.4627 ha.

15,5224 he (SPS) + 1,9403 he (household needs)

Land use designation: 14.01 - for the location, construction, operation and maintenance of buildiings and construction of power generating facilities, institutions and organizations 

Cadastral numbers:

6824482000:06:043:0025; 6824482000:06:044:0010

Technical conditions:  9 MW 

Documents:

  • Topographic and geodetic surveying of the land plot was developed;
  • City-planning conditions and restrictions were received
  • Technical conditions approved by “UKRENERGO”
  • Project “Stage P” is developed;
  • Notice of commencement of construction works (CC1);
  • PPA Agreement with SE “Guaranteed Buyer” was obtained;

Infrastructure:

  • The plot is flat and has a very good location
  • Voltage at the connection point of 35 kV. The point is situated on the distance of 0.2 km.(200 meters)

Pay-back period: 5 years

Cost: 40 000 євро/МВт