The solar energy market of Ukraine is developing at an increasing pace. Thanks to a well-thought-out policy using the incentive in the form of a "green tariff", the number of people wishing to take up a promising business area is increasing. EDS-DEVELOPMENT in 2018 has both completed and ongoing projects for the construction of SPS. A wide staff of highly qualified specialists allows the company to sign new contracts. In the middle of autumn 2018, they began to fulfill the order for the construction of a solar power station in s. Wide, Zaporizhzhya region
The object will occupy an area of 38 hectares. The estimated total capacity of the station will be 19.9 MW. The number of FEM will be 67660 units.
Employees of the company carried out preliminary work aimed at landscaping, delivery of necessary materials and tools to the facility. After unloading, installing cabins and the arrival of specialized equipment, the installation crews began the first phase of construction. Currently completed:
- Drilling holes under the stands of FEM tables. 12,826 out of 28,888 (44.40%) drilled;
- Installation and concreting of racks of tables of FEM. 9407 of 28888 (32.56%) were installed.