We are informing you about the beginning of the implementation of a new alternative energy facility - a 7 MW solar power station. It will be located on the territory of the Zhadanovsky village council in the Magdalinovsky district of the Dnipropetrovsk region. EDS Group traditionally acts as the general contractor, performing a full range of works on the construction of the facility.
The generation of solar energy will provide photovoltaic panels Jinko Solar 330 watts. At the SPS is under construction, 40 powerful Huawei SUN2000 string inverters will operate with a unit capacity of 175 kW, which today is among the best in the world in terms of price-quality ratio.
4 complete transformer substations KTP-2000/10/0.8 and a distribution point of RP 10 kV will be installed on the territory of the future SPS with the help of builders and electrical engineers of EDS-DEVELOPMENT. The power equipment will also be updated at the Urozhay Naya 150 kV substation, with the help of which the solar power station will be connected to the networks.