
Ready To Build
Land with PPA from 2019 and the Project of the stage "P" is ready for the construction of a solar power station
We approve 14.01 designated purpose in the land cadaster – for location, construction, operation and maintenance of buildings and structures of energy generating facilities. Technical conditions for 25 MW