EDS has completed the construction of a new solar power station in the Zaporizhzhya region, Zaporizhzhya district, on the territory of the Razumovsky village council.
SPS parameters are as follows:
- 15,200 photo panels with a unit power of 345 W;
- 33 ABB inverters 120 kW and 1 inverter Huawei 40 kW;
two 10 kV transformer substations with Astor 2500/10 / 0.48 and 2000/10 / 0.48 kVA transformers; - a number of relay protection and automation cells for transformers KTP No. 1 and No. 2.



During the construction, we performed the following works:
- zero cycle and hole drilling;
- concreting and installation of racks of tables;
- installation of fencing, administration and amenity complex and utility rooms;
- installation of PTS 10 / 0,4 kV;
- development of trenches for the security control point and laying of the 0,4 and 10 kV cables, laying of the solar cable;
- outdoor lighting installation, video surveillance installation;
- road construction works;
- installation and connection of PV modules and inverters;
- telemechanics;
- laboratory tests of transformers;
- installation of ASCA.
Thus, once again, EDS proudly confirms the title of the leading EPC-contractor in Ukraine in classic implementation of turnkey project, when the company assumes the full control of the construction process.