SPS Rozumivka 4 MW is ready!

промышленная солнечная электростанция 4 МВт

EDS has completed the construction of a new solar power station in the Zaporizhzhya region, Zaporizhzhya district, on the territory of the Razumovsky village council.


SPS parameters are as follows:

  • 15,200 photo panels with a unit power of 345 W;
  • 33 ABB inverters 120 kW and 1 inverter Huawei 40 kW;
    two 10 kV transformer substations with Astor 2500/10 / 0.48 and 2000/10 / 0.48 kVA transformers;
  • a number of relay protection and automation cells for transformers KTP No. 1 and No. 2.
промышленные солнечные электростанции
солнечные эс
промышленная солнечная электростанция 4 МВт

During the construction, we performed the following works:

  • zero cycle and hole drilling;
  • concreting and installation of racks of tables;
  • installation of fencing, administration and amenity complex and utility rooms;
  • installation of PTS 10 / 0,4 kV;
  • development of trenches for the security control point and laying of the 0,4 and 10 kV cables, laying of the solar cable;
  • outdoor lighting installation, video surveillance installation;
  • road construction works;
  • installation and connection of PV modules and inverters;
  • telemechanics;
  • laboratory tests of transformers;
  • installation of ASCA.

Thus, once again, EDS proudly confirms the title of the leading EPC-contractor in Ukraine in classic implementation of turnkey project, when the company assumes the full control of the construction process.