Because 1 MW is the upper limit for the land-based industrial SPSs at which the facility is entitled to a “green” tariff from 2020.
The tariff is regulated by the laws of Ukraine "On the Electrical Energy Market" and "On Alternative Energy Sources", is establish as of the date of the station's commissioning and will not change until 2030.
The tariff is pegged to the Euro, which eliminates the risks of devaluation of the national currency.
After the expiration of the tariff in 2030, you will be able to sell the electrical energy on the direct contracts market at a commercial price.
How much does it cost to build a 1 MW SPS. Income from industrial a 1MW SPS.
EDS-Development specialists have assessed the payback period of a 1 MW solar power station. We used data from operating SPSs from EDS's own generation and maintenance assets, as well as the average market value of equipment and construction.
Cost of 1 MW SPS = 600,000 (construction and equipment) + 65,000 Ready to build + 90,000-110,000 Connection
= 750,000 euros excluding VAT *
- вартість розрахована як середня ринкова. Окремі пропозиції будуть відрізнятися. EDS-Engineering, наприклад, пропонує реалізувати одномегаватний проект “під ключ” за 650 000 євро.
The real payback of the SPS is 5-7 years, depending on the date of the SPS commissioning. Project implementation period is about 6 months:
| SPP launch year | Dependence of the tariff on the year of SPP launch | SPP generation 1 MW per year | Income for the year |
|---|---|---|---|
| You launched the SPP in the period from 01/01/2020 to 12/31/2020 | 0,135 euro / kWh with VAT | 1227 MW / year | 165 645 euro with VAT |
| You launched the SPP in the period from 01/01/2021 to 12/31/2021 | 0,130 euro / kWh with VAT | 1227 MW / year | 159 510 euro with VAT |
| You launched the SPP in the period from 01/01/2022 to 12/31/2022 | 0,126 euro / kWh with VAT | 1227 MW / year | 154 602 euro with VAT |
| You launched the SPP in the period from 01/01/2023 to 12/31/2024 | 0,121 euro / kWh with VAT | 1227 MW / year | 148 467 euro with VAT |
| You launched the SPP in the period from 01/01/2025 to 12/31/2029 | 0,117 euro / kWh with VAT | 1227 MW / year | 143 559 euro with VAT |
EDS-Development is following the trends and has prepared the Base of Ready to build land plots, ready for the construction of a 1 MW SPS
We present our product - land plots for the construction of 1 MW industrial solar power stations.
Our developers have chosen plots with optimal parameters, changed the designated purpose, the design department has developed a plan of the PV panel field.
The TS draft is being prepared, topographic and geodetic survey has been completed. A complete package of land documents minimizes risks and significantly speeds up the project implementation.
In fact, having bought a land plot from us, You can start a construction tomorrow.