The construction of two solar power plants with a total capacity of 6.2 MW in s. Borki Zmievsky district of Kharkov region.
The construction of two 2.2 MW and 4 MW solar power stations on the territory of 4 and 8 hectares takes place in parallel to reduce the terms of the project. Given the high level of expertise of the EMF-DEVELOPMENT team, the parallel execution of all production processes can save significant resources due to well-functioning logistics.